[1]
R. Silva Figueroa, G. Echeverría Herrera, J. Vega Arriaza, and D. Salamanca Vera, “New approach to contract modifications at the sub-directorate of works of the road works directorate ”, RIOC, vol. 13, no. 1, pp. 1–16, Apr. 2025.